the barge was completed in winter 2007 and came first time into the water at the beginning of 2008
the running time of the Perkins engine is 1600 hours
Beta Generator 250 hours
in 2013, 2017 and 2021 the barge was in the shipyard for the new underwater coating ( 2K-Barrier Coating)
in 2016 a stern thruster was installed with 10 horse power
in 2017, a double SEPA filter system was installed
new batteries were installed in 2019
Extraordinary for a Sagar is the custom made railing, the designer bench on the outside of the stern and the
comfortably installed deck ladder.All are custom made...